Project Overview
Undertake detailed design engineering to resolve localised flooding issues along Blackwood Road in Greenbushes
Funding Partner
Talison Lithium
Completion Status
10%
Last Month
· Developed Engineers brief
· Consultant engagement
Planned action for next month
· Stormwater catchment study
Completion
· End July 2024
Undertake catchment study followed by concept landscape designs for the Jephson Street median isle.
This will be followed by community consultation to ensure the needs and wishes of the community are met.
· Prepare Landscape Architects & hydrological Engineers brief
· End August 2024
Refurbish the Roads Board toilets whilst making them accessible and compliant.
· Site measure by building designer
· Designs produced by building designer ready for construction
Installation of a new pump track and completion of surrounding landscape
75-100%
· Complete Pump Track construction
· Complete Landscape design
· Install landscape
· End June 2024
Reconstruction of severely degraded footpaths throughout Greenbushes using several methods to overcome damage by tree roots.
· Review of Concept
· Commenced Detailed Design RFQ
· Issue Civil RFQ for asphalt sheeting to some existing paths
· Award Detailed Design for footpaths requiring major interventions
· End September 2024
Asphalting Woodward at rear of Stinton Gardens,
Asphalting of George St 150m to Tourmaline
Asphalting of Diorite to Galena
Widen Cul-de-sac head on Diorite
0%
· Nil
· Develop roadworks RFQ
· End August 2024 pending weather
Installation of approx. 1km of kerbing within the Greenbushes local roads
Repairs and resurfacing of the Greenbushes Hard Courts
· Developed resurfacing RFQ
· Issue resurfacing RFQ
· Award resurfacing contract
· End July 2024 pending weather
Installation of solar and batteries to the Bridgetown Rec Centre, Library and Civic Centre with energy cost saving going into a sustainability reserve fund.
Talison Lithium & Department of Sport & Recreation
· Completed detailed new energy audit
· Engaged specialist renewable energy engineer
· Develop construction tenders
· December 2024 followed by Western Power approvals
Completion of the fit out and landscaping to the Bridgetown Train Station – New Visitor Centre, making it a modern, accessible multi purpose facility.
Shire and Talison Lithium
· Installation of cupboards, desks, audio, electrical, comms, furniture, fencing, bins and planter boxes.
· Installation of connecting pathways, ACROD bays and planting
· June 2024
Addition of Air Conditioning, screen and projector to the Town Hall Project, ensuring it will become an all weather and all seasons venue for culture and the arts.
Funding Partners
Shire, Talison Lithium, Lotterywest and WA Recovery
· Issue Air Conditioning Tender
· Award of Tender
· Install roof access
· Commence internal AC fit out
· Order major AC components
· Commence ceiling fit off
· November 2024
Relocation of the Greenbushes Railway Station to the rear of the Greenbushes Discovery Centre. The project includes roof replacement and repairs to the building ready for fit out by the Discovery Centre.
· Building Relocation
· Roof removal
· New roof sheeting installed
· Flooring repairs
· Carpentry works
· July 2024
Construction of a new fit for purpose fire station on Collins Street Greenbushes
Shire and DFES
· Rock breaking and earthworks
· Sand pad installation
· Plumbing pre-lay
· Concrete slabs and footings